Chemical damp-proof course injection

Chemical damp-proof course injection for Melbourne brick walls: when it suits, what the work involves, published price ranges and the checks to make first.

Chemical damp-proof course injection puts a new water-repellent barrier into an existing masonry wall by drilling a line of holes along a low mortar course and filling them with a treatment product. It suits walls where the original damp-proof course has failed or was never installed, provided the damp has been confirmed as rising from the ground and any bridging has been removed first. Published Melbourne prices run at $74 to $260 per metre, and the providers this site refers enquiries to quote and do the work themselves.

Illustrative photo for Chemical damp-proof course injection

When is injection the right answer?

Injection only treats one cause: moisture moving up through the masonry by capillary suction. Heritage Victoria’s flood-affected masonry technical note advises giving an existing damp-proof course the chance to work before installing a new one. That means lowering garden beds and paving below the course, grading the ground away from the wall, making sure gutters and drains work, and removing anything that blocks subfloor vents.

If those steps are done and the wall is still wet near the floor, a new barrier may be warranted. The note adds that a new damp-proof course should sit below any floor timbers, because the timbers need protection from dampness as well. A rising damp inspection is the step that shows whether the problem is really rising damp or a leak, rain entry or condensation dressed up to look like it.

Injection compared with the other options

Option What it does Suits Limits
Fix bridging and drainage Restores the old course’s job by dropping ground levels and clearing vents Walls with a sound original course that is buried or bypassed Will not help where the course has failed or is missing
Chemical injection Water-repellent product injected into a drilled mortar course Solid brick walls with continuous mortar joints and good access Results depend on hole spacing, depth, product and wall make-up
Mechanical damp-proof course replacement Physical membrane inserted into a cut mortar joint Walls where a durable physical barrier is wanted, including many heritage buildings Slower, more disruptive and needs careful structural sequencing
Salt extraction and sacrificial plaster Draws salts out of the wall face Any salt-laden wall, often alongside the above Does not stop new moisture rising

What will the provider check or need before quoting?

  • The total length of wall to treat, measured on each side, and the wall thickness
  • Whether walls are solid brick, cavity brick, bluestone or rubble core, since thick stone walls can hold voids that absorb treatment unevenly
  • Where the floor level and floor timbers sit relative to the proposed injection line
  • Internal finishes that must come off, such as plaster or skirting boards
  • Pipes, cables and gas lines running in or along the wall
  • For a heritage-listed building, whether council or Heritage Victoria approval is needed for any external work

For strata buildings, external walls may be common property. Expect the provider to ask who has authority to approve the job, because Consumer Affairs Victoria’s guidance bars lot owners from repairing common property without the owners corporation’s authority.

What does the work involve?

A typical injection job runs in this order. The provider strips damp-affected plaster back to bare masonry, usually to a height above the visible tide mark. Holes are drilled into the chosen mortar course at the spacing and depth set out in the product instructions, from one or both sides depending on wall thickness. The product is injected, the holes are sealed, and the wall is left to dry. Re-plastering follows later with a material suited to a salt-affected wall, which is covered on our render and plaster repair page.

Drying takes time. The flood note points out that salts already in the wall keep dissolving and recrystallising with changes in humidity, so new plaster applied straight over a salty wall can fail even when the new barrier is working.

How much does injection cost in Melbourne?

The October 2026 Melbourne bricklaying table puts injection at $74 to $260 per metre, including GST. Retrofitting a barrier to an entire house appears in the same table at $1,050 to $6,300. Plaster removal, salt treatment and re-plastering are usually priced on top. The cost guide breaks down the items that move a quote up or down.

Which rules apply?

The Building and Plumbing Commission (BPC) says domestic building work above its registration threshold must be done by a registered builder, and the threshold counts labour, materials and GST across the whole project. A large injection and re-plastering job can pass that figure, so check the current threshold on the BPC’s engaging a builder page and look the provider up on the BPC practitioner register before signing.

For new work, the ABCB Housing Provisions under the NCC set requirements for damp-proof course materials and installation in masonry walls. A retrofit into an old wall cannot always match a new-build detail, so ask the provider to explain in writing where their method sits against those requirements and against the product maker’s instructions.

What a careful provider will refuse to do

  • Inject a wall where the existing course is bridged by soil, paving or render, without first fixing the bridge
  • Inject above floor timbers and leave the timbers exposed to damp
  • Re-render the base of a heritage wall in hard cement to hide salts, which the heritage note warns against
  • Drill into a wall without checking for hidden pipes, cables or gas lines
  • Promise a set drying time for a wall nobody has tested for salt

Local angle

Suburbs such as Carlton and Fitzroy were laid out in the mid-1800s, long before cement mortars were common. The Heritage Council of Victoria’s guide to repointing mortar joints says lime was the main binder in mortars and plasters until the mid-twentieth century. Soft lime joints can take injection well, but they also erode where salts concentrate, so many jobs pair injection with repointing. Our Carlton and Northcote pages cover the local housing.

What to do next

Ask for an injection quote with the suburb, wall lengths if you have them, the wall type and whether an inspection report already exists. Mention any heritage listing or owners corporation so the provider can plan approvals.

Send a job enquiry

Frequently asked questions

How long before I can replaster after injection?

It depends on wall thickness, how wet the wall was and the salt load. Thick walls can take months. A provider should check moisture and salts before replastering rather than working to a fixed date.

Does injection work on bluestone walls?

Stone walls are usually treated through their mortar joints rather than the stone itself. Thick or rubble-core stone walls can have voids, and some providers prefer a mechanical course for them. Ask the provider to explain their method for your wall type.

Will the holes show?

The holes are drilled into a mortar course and filled afterwards. On face brick they can be filled with a mortar coloured to match. On heritage facades, ask how the holes will be made good before the job starts.

Is injection a structural change?

Drilling and injecting does not usually change how the wall carries load, but it is still building work. Large combined jobs can pass the BPC registration threshold, so check the provider's registration for the total project value.

Can I inject one wall and leave the rest?

Sometimes, if only one wall is affected and the barrier can be joined properly at the corners. A gap in the barrier can let damp bypass it, so the provider should explain where the treated section starts and stops.